Landfill & Lined Basin Guide

Landfill, lined basin and containment design

Landfills, ponds and basins must hold waste or water without leaking and stay stable over time. This guide explains liner systems, slope stability and construction quality control.

Start here

Containment depends on the liner and the slopes

A small defect in a liner or an unstable slope can cause major environmental damage.

We design liner systems with geosynthetics and compacted clay, check stability of slopes and liner interfaces, and support construction with inspection and testing.

  1. 01ContentsWaste type or water quality.
  2. 02RegulationsEPA licence and guideline requirements.
  3. 03GroundGroundwater level and foundation soils.
  4. 04MaterialsLocal clay availability.
Geomembrane-lined landfill basin

Comparison

What we design — at a glance

An overview only. Every entry below is described cautiously and is not an engineering limit; suitability is always confirmed against site-specific data.

Comparison of design elements, typical applications and key limitations
Design elementsBest suited toKey consideration
Liner systemsLandfill cells, ponds and lined basins.Material selection, thickness and protection layers.
Leachate & drainageLandfills and contaminated sites.Flow capacity and filter compatibility.
Slope & interface stabilitySteep landfill and basin sides.Limit equilibrium and numerical analysis.
Capping & closureLandfill closure and rehabilitation.Cover layers, drainage and vegetation.

Design elements

What we design

Designed to EPA guidelines and project requirements.

Design element 01

Liner systems

Geomembrane, geosynthetic clay and compacted clay liners.

Best suited to / typical applications

Landfill cells, ponds and lined basins.

Design & construction considerations

Material selection, thickness and protection layers.

Limitations, risks & verification

Installation quality decides performance.

Discuss this option

Design element 02

Leachate & drainage

Leachate collection and subsoil drainage layers.

Best suited to / typical applications

Landfills and contaminated sites.

Design & construction considerations

Flow capacity and filter compatibility.

Limitations, risks & verification

Needs maintenance access.

Discuss this option

Design element 03

Slope & interface stability

Stability of cell slopes and liner interfaces.

Best suited to / typical applications

Steep landfill and basin sides.

Design & construction considerations

Limit equilibrium and numerical analysis.

Limitations, risks & verification

Interface strength should be tested.

Discuss this option

Design element 04

Capping & closure

Final cover systems for completed cells.

Best suited to / typical applications

Landfill closure and rehabilitation.

Design & construction considerations

Cover layers, drainage and vegetation.

Limitations, risks & verification

Settlement of waste must be allowed for.

Discuss this option

Selection considerations

What usually decides the approach

These factors tend to narrow the options faster than any single test result. Every recommendation remains site-specific and subject to the available data.

  • ContentsWaste type or water quality.
  • RegulationsEPA licence and guideline requirements.
  • GroundGroundwater level and foundation soils.
  • MaterialsLocal clay availability.

Method

How the work runs

Scope is adjusted to the project, the risk and the information already available.

  1. 01InvestigateSite and material investigation.
  2. 02DesignLiner, drainage and stability design.
  3. 03QAConstruction inspection and testing.
  4. 04ReportConstruction quality report.

Typical deliverables

  • Design drawings and specification
  • Stability analysis report
  • Construction quality assurance plan
  • As-constructed report